Skip to content
Nuclear's Second Act episode artwork

EPISODE · Oct 23, 2026 · 8 MIN

Nuclear's Second Act

from RADIO MR/FLO: Politics · host RADIO MR/FLO

President Trump's 2025 executive orders aim to grow U.S. nuclear capacity from about 100 gigawatts toward 400 gigawatts by 2050. In September 2026, the NRC issued the first-ever construction permit for a commercial small modular reactor, for TVA's Clinch River BWRX-300.

Episode metadata supplied by the publisher feed · Published Oct 23, 2026

Embed this episode

Ready to play

Nuclear's Second Act

0:00 8:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of RADIO MR/FLO: Politics?

This episode is 8 minutes long.

When was this RADIO MR/FLO: Politics episode published?

This episode was published on October 23, 2026.

Can I download this RADIO MR/FLO: Politics episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!