NuGen Launches Solar Farm on Bristol Landfill episode artwork

EPISODE · Jul 25, 2024 · 21 MIN

NuGen Launches Solar Farm on Bristol Landfill

from Bartholomewtown · host Bill Bartholomew / Lisa Frazier

Send us Fan MailSupport the showFollow Bill on Instagram and YouTube

Send us Fan Mail Support the show Follow Bill on Instagram and YouTube

NOW PLAYING

NuGen Launches Solar Farm on Bristol Landfill

0:00 21:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bartholomewtown?

This episode is 21 minutes long.

When was this Bartholomewtown episode published?

This episode was published on July 25, 2024.

What is this episode about?

Send us Fan MailSupport the showFollow Bill on Instagram and YouTube

Can I download this Bartholomewtown episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!