Skip to content
NWPPA Morning Brief - Tuesday, August 25, 2026 episode artwork

EPISODE · Aug 25, 2026 · 12 MIN

NWPPA Morning Brief - Tuesday, August 25, 2026

from NWPPA Morning Brief

NWPPA Morning Brief — Tuesday, August 25, 2026 In today's brief: Top Federal Developments DOE Declines to Designate Three National Interest Electric Transmission Corridors — https://insideepa.com/climate-news/doe-scuttles-transmission-corridors-slams-climate-alarmist-agenda Bureau of Reclamation Finalizes Two-Year Colorado River Operating Plan with Mandatory Cuts — https://www.circleofblue.org/newsletter/federal-water-tap-august-24-2026-feds-finalize-colorado-river-water-cuts-in-two-year-plan/ FERC Denies MISO $280M Capacity Auction Complaints; SPP Approves Cross-Interconnection Capacity Study — https://www.stoel.com/insights/reports/energy-regulatory-updates/august-19-2026 Microsoft and PowerHouse Hillwood Contest Data Center Service Agreements at FERC — https://www.utilitydive.com/news/microsoft-powerhouse-hillwood-data-center-service-ferc/828566/ Top Regional / State Developments Nevada Sues to Block Colorado River Operating Plan — https://www.eenews.net/articles/nevada-launches-legal-war-over-trumps-colorado-river-plan/ Hawk Fire De-Energization Cuts Power to 37,000 in Truckee and North Lake Tahoe — https://www.cbsnews.com/sacramento/news/truckee-donner-utility-customers-power-outage-hawk-fire/ Oregon Trail Electric Cooperative Workers Strike — https://www.opb.org/article/2026/08/24/oregon-trail-electric-cooperative-strike-unfair-labor-practices/ California Advances Two Virtual Power Plant Bills; CAISO Board to Consider BTM Battery Exports — https://www.iesna.com/news-insights/california-vpp-bills-clear-committee-as-grid-battery-capacity-tops-21-gw/ Montana DEQ Awards $10.34M for Rural Grid Resilience — https://bigskyheadlines.com/2026/08/deq-awards-10-34m-to-improve-electricity-resilience-in-rural-montana/ Pilot notice: AI-generated daily briefing. Verify before acting on it. Feel free to reach out if you have comments or concerns.

Episode metadata supplied by the publisher feed · Published Aug 25, 2026

Embed this episode

NWPPA Morning Brief — Tuesday, August 25, 2026 In today's brief: Top Federal Developments DOE Declines to Designate Three National Interest Electric Transmission Corridors — https://insideepa.com/climate-news/doe-scuttles-transmission-corridors-slams-climate-alarmist-agendaBureau of Reclamation Finalizes Two-Year Colorado River Operating Plan with Mandatory Cuts — https://www.circleofblue.org/newsletter/federal-water-tap-august-24-2026-feds-finalize-colorado-river-water-cuts-in-two-year-pl...

Distinct summary based on available episode metadata or transcript content.

Ready to play

NWPPA Morning Brief - Tuesday, August 25, 2026

0:00 12:38

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of NWPPA Morning Brief?

This episode is 12 minutes long.

When was this NWPPA Morning Brief episode published?

This episode was published on August 25, 2026.

Can I download this NWPPA Morning Brief episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!