Obras llevada a cabo por Cooperativa eléctrica episode artwork

EPISODE · May 24, 2018 · 43 MIN

Obras llevada a cabo por Cooperativa eléctrica

from Radio Alcira Gigena

Esta mañana Luis Fontana visitó nuestros estudios y nos dio detalles de las obras de gas, agua y fibra óptica que esta finalizando la institución. Ademas se manifestó sobre otros servicios que se programaran para este año. Toda la información aquí:

Episode metadata supplied by the publisher feed · Published May 24, 2018

Embed this episode

NOW PLAYING

Obras llevada a cabo por Cooperativa eléctrica

0:00 43:50

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Radio Alcira Gigena?

This episode is 43 minutes long.

When was this Radio Alcira Gigena episode published?

This episode was published on May 24, 2018.

Can I download this Radio Alcira Gigena episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!