Skip to content
Off Track: Network Rail episode artwork

Jul 8, 2015 36 min

Off Track: Network Rail

from File on 4 Investigates Hosted by BBC Radio 4

Works behind schedule; costs going up; an inquiry into poor performance announced by the industry regulator. It's a depressingly familiar story on our railways. From brand new station escalators at a standstill in Birmingham, to only 10 per cent of trains on time at one of London's busiest stations, even the Chancellor's planned Northern Powerhouse is threatened as line upgrades between Manchester and York are delayed. Allan Urry investigates Network Rail's woes as pressure mounts to deliver £24 billion of infrastructure improvements. Reporter: Allan Urry Producer: Rob Cave.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Off Track: Network Rail

0:00 36:51

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of File on 4 Investigates?

This episode is 36 minutes long.

When was this File on 4 Investigates episode published?

This episode was published on July 8, 2015.

Can I download this File on 4 Investigates episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.