Offshore Wind Is Outgrowing the Boats That Build It episode artwork

EPISODE · Aug 13, 2026 · 26 MIN

Offshore Wind Is Outgrowing the Boats That Build It

from Switched On · host Bloomberg

Offshore wind turbines are getting too big for the ships that install them. BloombergNEF estimates more than 30 gigawatts of offshore wind installations could struggle to find suitable vessels through 2035 if turbine growth continues. But building bigger ships takes years and hundreds of millions of dollars, and retrofits have their limits. That leaves the industry facing a choice between expanding its installation fleet or slowing the relentless growth in turbine size. So could a shortage of sufficiently large vessels become offshore wind’s next major bottleneck? On today’s show, Kamala Schelling is joined by BloombergNEF wind team analyst Kajsa Jernetz to discuss her note “Wind Installation Vessels: You’re Gonna Need a Bigger Boat.” Complementary BNEF research on the trends driving the transition to a lower-carbon economy can be found at BNEF<GO> on the Bloomberg Terminal or on bnef.com Links to research notes from this episode: Wind Installation Vessels: You’re Gonna Need a Bigger Boat - https://www.bnef.com/insights/40141See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Aug 13, 2026

Embed this episode

NOW PLAYING

Offshore Wind Is Outgrowing the Boats That Build It

0:00 26:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Switched On?

This episode is 26 minutes long.

When was this Switched On episode published?

This episode was published on August 13, 2026.

Can I download this Switched On episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!