EPISODE · Mar 8, 2025 · 9 MIN
Old Boundary Road - Infrastructure
from eves · host eves
Compilation of sounds gathered from the Western Treatment Plant wastewater facility. Sounds presented across a 4 channel outdoor sound installation, transduced through large steel pipes. The sounds included here were not arranged linearly but were on their own compositional directions, moving across the 4 channels in differing directions and speeds.
Embed this episode
Ready to play
Old Boundary Road - Infrastructure
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.