Skip to content
Olympic Security Cost Overruns episode artwork

EPISODE · Nov 7, 2018 · 38 MIN

Olympic Security Cost Overruns

from CONNECT older episodes · host CHQR / Curiouscast

ARE ALBERTA’S POLITCAL PARTIES IN CRISIS? With Premier Notley losing support and former PC party members shifting to the Alberta Party, are the left and right respectively in a crisis? Joe talks with Lori Williams, Associate Professor of Political Science at Mount Royal University. EXPLOSIVES IN SHERWOOD PARK Joe gets a debrief of an RCMP news conference from Global News Edmonton’s Fletcher Kent about the explosives found in Sherwood Park this afternoon. OLYMPIC SECURITY COSTS Continuing our look into the various facets of an Olympic bid, Joe talks to Dr. Michael Heine, Director of the International Centre for Olympic Studies at Western University about who gets the bill when it comes to security cost overruns. REMEMBRANCE DAY Joe talks with Rory M. Cory, Senior Curator/Director of Collections at The Military Museums about the end of WWI and Armistice.

Episode metadata supplied by the publisher feed · Published Nov 7, 2018

Embed this episode

Ready to play

Olympic Security Cost Overruns

0:00 38:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of CONNECT older episodes?

This episode is 38 minutes long.

When was this CONNECT older episodes episode published?

This episode was published on November 7, 2018.

Can I download this CONNECT older episodes episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!