EPISODE · Mar 24, 2026 · 20 MIN
Only 2.5% of Contractors Finish on Time. Here's What They Do Before the Job Starts
from Construction Genius
Only 2.5% of contractors finish on time and on budget. Here's what they do before the job starts. In this episode, Eric Anderton breaks down Part 1 of FMI's 2025 Project Management Study — 243 executives, 84 PMs, real contractors, real numbers. What they found isn't revolutionary. It's the same truth Vince Lombardi was teaching in 1959. Preparation before the work starts. Accountability to a consistent standard. Everyone owning their role before the first crew hits the job site. The three things separating high performers from everyone else: PM involvement in estimating, structured pre-execution planning, and field buy-in before mobilization. The one role responsible for making all three happen — or failing to — is your project executive. Three Numbers Every Owner Should Know PM involvement in estimating → margin attainment jumps from 55% to 78% Thorough pre-execution planning → profit margins hit 81% vs. 50% of the time Strong field alignment → on-time/early completion 76% vs. 58% of the time Hosted by Eric Anderton — leadership coach, executive coach, and 20+ year veteran of the construction industry. FMI 2025 Study: https://fmicorp.com/insights/thought-leadership/2025-project-management-study-part-1 Executive coaching for your PX — book a call: https://10minuteswitheric.youcanbook.me/ Construction Genius book: https://www.amazon.com/Construction-Genius-Effective-Hands-Leadership/dp/B0BHTRDY1T/ The Shift leadership course: https://theshift.constructiongenius.com/
NOW PLAYING
Only 2.5% of Contractors Finish on Time. Here's What They Do Before the Job Starts
No transcript for this episode yet
Similar Episodes
May 7, 2026 ·31m
Apr 23, 2026 ·27m
Apr 9, 2026 ·32m
Mar 26, 2026 ·35m
Feb 26, 2026 ·32m
Feb 12, 2026 ·44m