Optimised Planning for Optimised Output episode artwork

EPISODE · Mar 18, 2016 · 11 MIN

Optimised Planning for Optimised Output

from Hexagon Radio · host Hexagon

Hexagon Mining’s new short term planning scheduling technology, Atlas 3.0, will assist in creating an optimised product blend, taking into account material and grade constraints.

Hexagon Mining’s new short term planning scheduling technology, Atlas 3.0, will assist in creating an optimised product blend, taking into account material and grade constraints.

NOW PLAYING

Optimised Planning for Optimised Output

0:00 11:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Hexagon Radio?

This episode is 11 minutes long.

When was this Hexagon Radio episode published?

This episode was published on March 18, 2016.

What is this episode about?

Hexagon Mining’s new short term planning scheduling technology, Atlas 3.0, will assist in creating an optimised product blend, taking into account material and grade constraints.

Can I download this Hexagon Radio episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!