OPW To Assess Pyrite Damaged Shannon Garda Station episode artwork

EPISODE · Apr 21, 2026 · 3 MIN

OPW To Assess Pyrite Damaged Shannon Garda Station

from Clare FM · host Clare FM

The Office of Public Works is set examine remediation options for a pyrite damaged Garda station in Clare. The defective mineral was conclusively detected in Shannon's station last November, with cracks in the walls first noted in 2022. The OPW will publish a list of potential solutions to the problem by next month, but it says structural works won't be necessary for at least the next five years. Clare Fianna Fáil TD Cathal Crowe wants to see the problem treated with urgency.

Episode metadata supplied by the publisher feed · Published Apr 21, 2026

Embed this episode

NOW PLAYING

OPW To Assess Pyrite Damaged Shannon Garda Station

0:00 3:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Clare FM?

This episode is 3 minutes long.

When was this Clare FM episode published?

This episode was published on April 21, 2026.

Can I download this Clare FM episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!