Ørsted Installs at Sunrise Wind, Pentagon Blocks 7.5 GW episode artwork

EPISODE · Apr 20, 2026 · 2 MIN

Ørsted Installs at Sunrise Wind, Pentagon Blocks 7.5 GW

from Uptime Podcast – Weather Guard Lightning Tech · host Weather Guard

Weather Guard Lightning Tech Ørsted Installs at Sunrise Wind, Pentagon Blocks 7.5 GW Allen covers Ørsted’s first turbine install at Sunrise Wind, Cadeler’s fleet expansion, the Pentagon’s 7.5 GW onshore backlog, and the UK’s £154B onshore wind […]

Episode metadata supplied by the publisher feed · Published Apr 20, 2026

Embed this episode

Ready to play

Ørsted Installs at Sunrise Wind, Pentagon Blocks 7.5 GW

0:00 2:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Uptime Podcast – Weather Guard Lightning Tech?

This episode is 2 minutes long.

When was this Uptime Podcast – Weather Guard Lightning Tech episode published?

This episode was published on April 20, 2026.

Can I download this Uptime Podcast – Weather Guard Lightning Tech episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!