Outrage over silence as toxic oil tailings leaked episode artwork

EPISODE · Mar 9, 2023 · 22 MIN

Outrage over silence as toxic oil tailings leaked

from Front Burner

Since the Kearl mine in northern Alberta began production on Treaty 8 territory in 2013, the company has touted technological innovations that they say “enhance environmental performance.” Yet for months, wastewater from the mine’s tailings ponds, containing arsenic, hydrocarbons and sulphides has been seeping into the land. The company that runs the mine, Imperial Oil, first reported the leak in May 2022 to the provincial regulator. But Chief Allan Adam of the nearby Athabasca Chipewyan First Nation says his community only learned of the seepage last month. That’s created anxiety, says Chief Adam, because people have been hunting, fishing and trapping without knowing there was a risk of contamination. Drew Anderson, the Narwhal’s Prairies reporter, joins us today to walk us through how the leak happened, Alberta’s tailings pond debate and who’s accountable. For transcripts of this series, please visit: https://www.cbc.ca/radio/frontburner/transcripts

Episode metadata supplied by the publisher feed · Published Mar 9, 2023

Embed this episode

Ready to play

Outrage over silence as toxic oil tailings leaked

0:00 22:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Front Burner?

This episode is 22 minutes long.

When was this Front Burner episode published?

This episode was published on March 9, 2023.

Can I download this Front Burner episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!