Skip to content
PA - Checklist Dates episode artwork

EPISODE · Feb 25, 2026 · 35 MIN

PA - Checklist Dates

from Storman Norman Presents · host Storman Norman

https://drive.google.com/file/d/166Vo64vXETmpojEYY90jb5MnkFF9xhye/view?usp=drive_link In this episode of Storman Norman Presents, we are tackling the strict chronological requirements for filing statutory plans in BC. Precision in dating is a professional responsibility. This episode clarifies the two critical dates required on every legal plan and why misrepresenting them can lead to a disciplinary inquiry. Key Study Points Date of Survey: Represents the final day field observations and monumentation were completed. Date of Plan: Represents the day the plan was finalized and signed in the office. The "Gap" Period: Professional risks associated with a long delay between the field survey and the plan filing. Statutory Compliance: Ensuring the survey reflects the legal state of the registry as of the survey date. Infographic: https://drive.google.com/file/d/1hUw42p8GgdNODMwKLJwgJJEhcQ2oKYBA/view?usp=drive_link

Episode metadata supplied by the publisher feed · Published Feb 25, 2026

Embed this episode

Ready to play

PA - Checklist Dates

0:00 35:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Storman Norman Presents?

This episode is 35 minutes long.

When was this Storman Norman Presents episode published?

This episode was published on February 25, 2026.

Can I download this Storman Norman Presents episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!