Papo Político #766 – Ifag anuncia cronograma de obras de parceria com o Governo de Goiás episode artwork

EPISODE · Aug 19, 2025 · 15 MIN

Papo Político #766 – Ifag anuncia cronograma de obras de parceria com o Governo de Goiás

from Papo Político com Fabiana Pulcineli · host Rádio CBN

Episode metadata supplied by the publisher feed · Published Aug 19, 2025

Embed this episode

Ready to play

Papo Político #766 – Ifag anuncia cronograma de obras de parceria com o Governo de Goiás

0:00 15:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Papo Político com Fabiana Pulcineli?

This episode is 15 minutes long.

When was this Papo Político com Fabiana Pulcineli episode published?

This episode was published on August 19, 2025.

Can I download this Papo Político com Fabiana Pulcineli episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!