EPISODE · Dec 13, 2016 · 5 MIN
Paro y bloqueo en Camiri en demanda de obras y empleos
from Radio Santa Cruz
La presidenta del Comité Cívico camireño lamentó que las autoridades de los tres niveles del Estado no “hagan nada” por Camiri y demandó la construcción del Mercado Central, Hospital Municipal, Caja Petrolera y la reactivación de actividades hidrocarburífera priorizando empleos para la población del lugar.
Embed this episode
NOW PLAYING
Paro y bloqueo en Camiri en demanda de obras y empleos
0:00
5:38
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Radio Santa Cruz?
This episode is 5 minutes long.
When was this Radio Santa Cruz episode published?
This episode was published on December 13, 2016.
Can I download this Radio Santa Cruz episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!