Skip to content
Pat Buchanan: Spec Changes, Owner's Reps, and the Architect-Builder Relationship episode artwork

Oct 19, 2026 1 hr

Pat Buchanan: Spec Changes, Owner's Reps, and the Architect-Builder Relationship

from The Build Project Hosted by Alex Molkentin

Pat Buchanan of Buchanan Construction Systems has been building custom homes in Boulder since the early '90s. He started as a framer, moved into supervision six months into a five-year build of a 16,000 square foot house near NCAR, and went on to work for years with Tom Stanko at Harrington Stanko. He says he still quotes Tom to subcontractors about three times a day. Alex and Pat talk about what happens when a builder steps into design. Pat walks through an architect's flooring spec he couldn't stand behind: 5/8" engineered plank, a 2mm wear layer, a pine core, 9" wide, over radiant heat. One substitution rippled into the paint colors, the cabinets and the schedule. They cover the liability that comes with changing a spec (the Spearin Doctrine), and what Alex calls being the steward of the design. They also get into Pat's 5% target on budget and schedule, why he sets a tile order date 12 weeks before install with a confirmation meeting four weeks before that, how his escalation allowance went from 7% a year to 30 to 35% after COVID, and why he recommends an owner's rep to every client. Pat also explains what a CLT roof fabricated in Austria bought him: a roof installed in two weeks, at roughly a $200,000 premium. The conversation closes on panelization and double-stud walls. The Build Project gives the mic to everyone who builds a house, from the architect to the person sweeping the floor. Hosted by Alex Molkentin of Fernhill Build Studio. Chapters 00:00 Intro 01:50 From framer to supervisor on a 16,000 sq ft house 05:21 When the carpenter becomes the builder 09:15 Lessons from Tom Stanko and Harrington Stanko 16:35 Stepping on design toes 19:46 One flooring spec, a whole project changed 26:17 Budget and schedule within 5% 28:51 Escalation after COVID 34:43 Why a builder wants an owner's rep 40:04 Picking subs 46:03 How the builder's role is changing 51:48 CLT roofs and commercial methods in custom homes 55:02 Panelization and double-stud walls

Episode details come from the podcast's RSS feed.

Embed this episode

Pat Buchanan of Buchanan Construction Systems has been building custom homes in Boulder since the early '90s. He started as a framer, moved into supervision six months into a five-year build of a 16,000 square foot house near NCAR, and went on to work for years with Tom Stanko at Harrington Stanko. He says he still quotes Tom to subcontractors about three times a day. Alex and Pat talk about what happens when a builder steps into design. Pat walks through an architect's flooring spec he coul...

Ready to play

Pat Buchanan: Spec Changes, Owner's Reps, and the Architect-Builder Relationship

0:00 1:00:21

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Build Project?

This episode is 1 hour and 0 minutes long.

When was this The Build Project episode published?

This episode was published on October 19, 2026.

Can I download this The Build Project episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.