EPISODE · Dec 23, 2016 · 0 MIN
Pedro Celis Campos
from Cecoprode Ves
El dirigentes del sector 3 grupo, Pedro Celis Campos, afirmó que la construcción del tren eléctrico perjudicó a muchos vecinos de la zona, puesto que no existe un camino adecuado para poder acudir a la estación del tren. Además son atemorizados por delincuentes que se refugian a pocos metros de los rieles.
Embed this episode
Ready to play
Pedro Celis Campos
0:00
0:34
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Cecoprode Ves?
This episode is 0 minutes long.
When was this Cecoprode Ves episode published?
This episode was published on December 23, 2016.
Can I download this Cecoprode Ves episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!