EPISODE · Aug 5, 2026 · 1 MIN
PennDOT Tackles Bathtub Flooding | Pittsburgh News
from Pittsburgh News Today | 2 Min News | The Daily News Now!
PennDOT’s tackling the infamous “Bathtub” flooding on Parkway East with a major floodwall upgrade—raising walls by five feet to drastically reduce future floods. Construction kicks off late September or early October, with lane closures, ramp shutdowns, and a full week-and-a-half closure in 2027. The project, set to wrap by late 2027 or early 2028, promises a drier, more reliable route for commuters. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/478e95a34d2ed8a3
Embed this episode
NOW PLAYING
PennDOT Tackles Bathtub Flooding | Pittsburgh News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.