EPISODE · Aug 5, 2026 · 1 MIN
PennDOT Upgrades Bathtub Floodwall | Pittsburgh News
from Pittsburgh News Today | 2 Min News | The Daily News Now!
PennDOT’s big upgrade on Pittsburgh’s infamous “Bathtub” stretch of I-376 is set to begin as early as October, raising and reinforcing 1,150 feet of floodwall and revamping drainage and roadways to prevent future flooding — but drivers brace for lane closures, ramp shutdowns, and a multi-year construction grind ending in 2029. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/8b5c57c481b5f625
Embed this episode
NOW PLAYING
PennDOT Upgrades Bathtub Floodwall | Pittsburgh News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.