EPISODE · Mar 26, 2025 · 7 MIN
Permission Granted For New Microsoft Data Centre In Dublin
from The Last Word with Matt Cooper
Energy supplier Energia has been given the go-ahead to build a data centre in Dublin to be operated by tech giant, Microsoft.Ian Guider, columnist with the Business Post, joins The Last Word to discuss this and more of the day's business news. Catch the full chat by pressing the 'Play' button on this page!
Embed this episode
NOW PLAYING
Permission Granted For New Microsoft Data Centre In Dublin
0:00
7:29
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Last Word with Matt Cooper?
This episode is 7 minutes long.
When was this The Last Word with Matt Cooper episode published?
This episode was published on March 26, 2025.
Can I download this The Last Word with Matt Cooper episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!