Permission Granted For New Microsoft Data Centre In Dublin episode artwork

EPISODE · Mar 26, 2025 · 7 MIN

Permission Granted For New Microsoft Data Centre In Dublin

from The Last Word with Matt Cooper

Energy supplier Energia has been given the go-ahead to build a data centre in Dublin to be operated by tech giant, Microsoft.Ian Guider, columnist with the Business Post, joins The Last Word to discuss this and more of the day's business news. Catch the full chat by pressing the 'Play' button on this page!

Episode metadata supplied by the publisher feed · Published Mar 26, 2025

Embed this episode

NOW PLAYING

Permission Granted For New Microsoft Data Centre In Dublin

0:00 7:29

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Last Word with Matt Cooper?

This episode is 7 minutes long.

When was this The Last Word with Matt Cooper episode published?

This episode was published on March 26, 2025.

Can I download this The Last Word with Matt Cooper episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!