PERT Analysis episode artwork

EPISODE · Oct 29, 2007 · 6 MIN

PERT Analysis

from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas

In this podcast, Ricardo introduces the main concepts of PERT Analysis, mechanism of calculation that uses the optimist, most probable and pessimistic duration in order to determine the expected duration of the task, allowing that the statistical concepts of standard deviation and variance be determined and then, the numerical probability of project duration accomplishment be calculated. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.

Episode metadata supplied by the publisher feed · Published Oct 29, 2007

Embed this episode

NOW PLAYING

PERT Analysis

0:00 6:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 5 Minutes Podcast with Ricardo Vargas?

This episode is 6 minutes long.

When was this 5 Minutes Podcast with Ricardo Vargas episode published?

This episode was published on October 29, 2007.

Can I download this 5 Minutes Podcast with Ricardo Vargas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!