PFIZER MISSED DEADLINE TO TURN IN MYOCARDITIS DATA episode artwork

EPISODE · Feb 17, 2023 · 4 MIN

PFIZER MISSED DEADLINE TO TURN IN MYOCARDITIS DATA

from The Highwire with Del Bigtree · host The Highwire with Del Bigtree

Pfizer missed a deadline to turn over internal studies on myocarditis, per an FDA order. The deadline came and went. Now, they quietly have a new date in June. Why the delay on such important data? And, why does the FDA set arbitrary deadlines which aren’t enforced?#VRBPAC #Myocarditis #Deadline #FDA #PfizerBecome a supporter of this podcast: https://www.spreaker.com/podcast/the-highwire-with-del-bigtree--3620606/support.

Episode metadata supplied by the publisher feed · Published Feb 17, 2023

Embed this episode

NOW PLAYING

PFIZER MISSED DEADLINE TO TURN IN MYOCARDITIS DATA

0:00 4:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Highwire with Del Bigtree?

This episode is 4 minutes long.

When was this The Highwire with Del Bigtree episode published?

This episode was published on February 17, 2023.

Can I download this The Highwire with Del Bigtree episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!