Pickering Square Still Not Done | Bangor News episode artwork

EPISODE · Jul 6, 2026 · 1 MIN

Pickering Square Still Not Done | Bangor News

from Bangor News Today | 2 Min News | The Daily News Now!

Pickering Square in Bangor, Maine, was supposed to be done by Friday—but Saturday rolls around and it’s still a work in progress. After two years of renovation, turning an old lot into a green space with brick sidewalks, crews are still finishing up. Construction began in July 2024, with most heavy lifting done last fall, but delays linger—benches were delayed due to a recall, and lighting had to be replaced from a manufacturing defect. Art panels, kiosks, and seeding bare patches are still on the horizon. The city’s Friday deadline? Looks like it’s been pushed. The ribbon-cutting? Still waiting. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/7841d717916328a5

Episode metadata supplied by the publisher feed · Published Jul 6, 2026

Embed this episode

Ready to play

Pickering Square Still Not Done | Bangor News

0:00 1:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bangor News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bangor News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on July 6, 2026.

Can I download this Bangor News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!