Pipeline Opponents Ignore Risk
from Frontier Centre Hosted by Frontier Centre
The cancellation of the Energy East pipeline project by TransCanada Corporation, citing delays caused by the regulatory process, newly lengthened and thickened by Ottawa, is emblematic of forces conspiring against rational energy and regulatory policy.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Frontier Centre?
This episode is 7 minutes long.
When was this Frontier Centre episode published?
This episode was published on March 27, 2019.
Can I download this Frontier Centre episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.