EPISODE · Sep 17, 2025 · 13 MIN
Pipes, Pressure & Penalties: Review of BCWSA Presentation
from Mack's Newtown Voice · host Mack's Newtown Voice
The 16 September 2025 presentation by the Bucks County Water and Sewer Authority (BCWSA) and Carol Engineering covered several key environmental and infrastructure topics relevant to Middletown and Newtown Townships, including the Neshaminy Interceptor replacement project, challenges with infiltration and inflow (I&I), water supply, and associated planning and operational concerns.
What this episode covers
The 16 September 2025 presentation by the Bucks County Water and Sewer Authority (BCWSA) and Carol Engineering covered several key environmental and infrastructure topics relevant to Middletown and Newtown Townships, including the Neshaminy Interceptor replacement project, challenges with infiltration and inflow (I&I), water supply, and associated planning and operational concerns.
NOW PLAYING
Pipes, Pressure & Penalties: Review of BCWSA Presentation
No transcript for this episode yet
Similar Episodes
Jul 22, 2025 ·55m
Jul 15, 2025 ·47m
Jul 8, 2025 ·61m
Jun 17, 2025 ·43m