EPISODE · Jun 10, 2026 · 54 MIN
Plan for Systems or Pay for It Later
from Green Architects' Lounge · host Chris Briley and Phil Kaplan
00:00 Welcome To GAL 00:02:48 The Last Word Cocktail 00:11:19 Why Mechanical Rooms Keep Growing 00:17:41 How Much Space Do You Actually Need 00:20:05 Think Distribution From Day One 00:22:04 Heat Pump Water Heaters 00:25:20 Ducted vs Ductless Heat Pumps 00:31:14 New Refrigerants New Space Requirements 00:32:35 Maintenance Nobody Talks About 00:34:51 ERVs And How To Route Them 00:41:52 Obstructions Clearances And Surprises 00:47:27 Show Up To The Pre-Construction Meeting 00:53:35 Final Call
Embed this episode
What this episode covers
Chris and Phil get into the mechanical room, the space every green architect underestimates and every installer wishes was bigger. They talk through what actually ends up in there, from heat pump water heaters and ducted systems to ERVs, dehumidifiers, batteries, solar inverters, and the server room your client forgot to mention until week three of construction. Along the way they cover sizing rules of thumb, the new refrigerant space requirements that will catch a lot of people off guard, why maintenance access needs to be designed in from the start, and how to think about distribution before the structure makes it impossible. It is a practical one for architects and designers who want to stop guessing and start planning.
NOW PLAYING
Plan for Systems or Pay for It Later
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.