Planning For a New Manufacturing Facility w/ Pat Reilly episode artwork

EPISODE · Apr 22, 2025 · 31 MIN

Planning For a New Manufacturing Facility w/ Pat Reilly

from The Manufacturing Executive

Whether you're packing up shop and moving to a new location or you're expanding your manufacturing operation, opening up a new facility is no small deal. From planning the timeline of events to scouting a new geographic location to assuring the on-site requirements meet your needs to mitigating downtime during a move, there's a lot to account for. Pat Reilly, Executive Vice President and industrial real estate broker at JLL, has spent his career helping industrial sector organizations navigate these waters. And today, he'll be sharing his knowledge with you.

Episode metadata supplied by the publisher feed · Published Apr 22, 2025

Embed this episode

Ready to play

Planning For a New Manufacturing Facility w/ Pat Reilly

0:00 31:35

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Manufacturing Executive?

This episode is 31 minutes long.

When was this The Manufacturing Executive episode published?

This episode was published on April 22, 2025.

Can I download this The Manufacturing Executive episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!