EPISODE · Aug 16, 2023 · 49 MIN
Planta de Ilopango pronto entrará al sistema de suministro
from La Entrevista con Diana Verónica y Tony · host Diana Verónica y Tony
El presidente de ANDA habló sobre los avances en la construcción de la planta potabilizadora de Ilopango.
Embed this episode
NOW PLAYING
Planta de Ilopango pronto entrará al sistema de suministro
0:00
49:15
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of La Entrevista con Diana Verónica y Tony?
This episode is 49 minutes long.
When was this La Entrevista con Diana Verónica y Tony episode published?
This episode was published on August 16, 2023.
Can I download this La Entrevista con Diana Verónica y Tony episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!