Skip to content
Pleno Sep13, P6 episode artwork

Sep 13, 2013 10 min

Pleno Sep13, P6

from noticias

Sometimiento a información pública del proyecto de urbanización de la línea mixta trifásica a 20 kv (doble circuito), para alimentación exterior a los sectores de huerta de honrubia, fuente baldomero y, batanejo.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Pleno Sep13, P6

0:00 10:45

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of noticias?

This episode is 10 minutes long.

When was this noticias episode published?

This episode was published on September 13, 2013.

Can I download this noticias episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.