Skip to content
Power Plants with Hard Drives episode artwork

EPISODE · May 30, 2026 · 21 MIN

Power Plants with Hard Drives

from Mack's Newtown Voice · host Mack's Newtown Voice

At a contentious 2026 meeting, over 1,000 residents of Upper Merion Township gathered to protest a massive data center development proposed by MLP Ventures. Led by developer Brian O’Neill, the plan to build 4.6 million square feet of infrastructure sparked intense criticism over potential environmental hazards, noise pollution, and massive energy consumption. While O'Neill emphasized the economic benefits and potential tax revenue increases for the school district, the local tax collector highlighted the developer's history of delinquent payments. Community members expressed deep skepticism toward the project's sustainability claims, specifically questioning the use of natural gas and the massive water requirements of the facilities. The meeting concluded with planning officials requesting further transparency as the community remains steadfast in its opposition to transforming the area into an industrial cluster.

Episode metadata supplied by the publisher feed · Published May 30, 2026

Embed this episode

Ready to play

Power Plants with Hard Drives

0:00 21:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mack's Newtown Voice?

This episode is 21 minutes long.

When was this Mack's Newtown Voice episode published?

This episode was published on May 30, 2026.

Can I download this Mack's Newtown Voice episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!