Skip to content
Powerline, Part IV: Down the Line episode artwork

Nov 30, 2017 31 min

Powerline, Part IV: Down the Line

from Outside/In Hosted by NHPR

Decades of legal and public relations battles with First Nations have changed the way that Hydro-Quebec approaches new projects. Today, the company hires specialists who consult with impacted communities, and modify the designs of their projects to take what they have heard into consideration. But is that enough?

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Powerline, Part IV: Down the Line

0:00 31:01

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Outside/In?

This episode is 31 minutes long.

When was this Outside/In episode published?

This episode was published on November 30, 2017.

Can I download this Outside/In episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.