Powersavers with Adrian Luke from DMS Energy
from Breakfast with Darren Kerwin Hosted by Breakfast with Darren Kerwin
This week Adrian has details on a new manufacturing plant being built in Queensland that has the potential to deliver 20% of Australia's renewable energy needs.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Breakfast with Darren Kerwin?
This episode is 6 minutes long.
When was this Breakfast with Darren Kerwin episode published?
This episode was published on July 11, 2022.
Can I download this Breakfast with Darren Kerwin episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.