Skip to content
Preparing for the TBM episode artwork

EPISODE · Jul 30, 2020 · 16 MIN

Preparing for the TBM

from HRBT Tunnel Talk · host VDOT Virginia Department of Transportation

As the Design-Builder for Virginia's largest construction project awaits Notice to Proceed, early work is underway on the Hampton Roads Bridge-Tunnel Expansion Project. The South Island is percolating with activity to prepare the island for the massive Tunnel Boring Machine (TBM) which will bore twin tunnels parallel to the existing tunnels. In the latest installment of HRBT Tunnel Talk, Paula Miller talks with Project Director Jim Utterback about the significant effort it takes to obtain such a large permit, and she learns about 8 months of preliminary island work from Xavier Billy, the Construction Manager for the Tunnel Approach Structures. Please subscribe to our podcast!

Episode metadata supplied by the publisher feed · Published Jul 30, 2020

Embed this episode

Ready to play

Preparing for the TBM

0:00 16:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HRBT Tunnel Talk?

This episode is 16 minutes long.

When was this HRBT Tunnel Talk episode published?

This episode was published on July 30, 2020.

Can I download this HRBT Tunnel Talk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!