Skip to content
Preparing to Build episode artwork

EPISODE · Apr 22, 2020 · 22 MIN

Preparing to Build

from HRBT Tunnel Talk · host Virginia Department of Transportation VDOT

Preparing to build the HRBT Expansion Project, Virginia's largest-ever construction project, didn't happen overnight. Before you mine and widen under and over water, state and federal agencies have to sign off on plans. In the latest installment of HRBT Tunnel Talk, Paula Miller, VDOT's Communications Manager, interviews the project director and the owner and contractor's environmental experts about the vitally important preparations. Be sure to subscribe to the show.

Episode metadata supplied by the publisher feed · Published Apr 22, 2020

Embed this episode

Ready to play

Preparing to Build

0:00 22:20

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HRBT Tunnel Talk?

This episode is 22 minutes long.

When was this HRBT Tunnel Talk episode published?

This episode was published on April 22, 2020.

Can I download this HRBT Tunnel Talk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!