PRESIDENTIAL PERMIT: AUTHORIZING ENBRIDGE ENERGY, LIMITED PARTNERSHIP TO OPERATE AND MAINTAIN THREE EXISTING PIPELINE FACILITIES AT PEMBINA COUNTY, NORTH DAKOTA, AT THE INTERNATIONAL BOUNDARY  episode artwork

EPISODE · Apr 17, 2026 · 8 MIN

PRESIDENTIAL PERMIT: AUTHORIZING ENBRIDGE ENERGY, LIMITED PARTNERSHIP TO OPERATE AND MAINTAIN THREE EXISTING PIPELINE FACILITIES AT PEMBINA COUNTY, NORTH DAKOTA, AT THE INTERNATIONAL BOUNDARY

from The White House In Audio · host Instaread Podcast

President Donald J. Trump issued a Presidential permit on April 15, 2026, to Enbridge Energy, Limited Partnership, authorizing the operation and maintenance of existing cross-border pipeline facilities at the U.S.-Canada border in Pembina County, North Dakota.This permit supersedes and revokes a previous permit issued on December 12, 1991, following an application for amendment submitted by Enbridge in January 2026.Key components of the permit include:Scope of Operation: The permit applies to three existing pipelines (26-inch, 34-inch, and 18-inch diameters) used to transport crude oil and a wide range of petroleum products, including jet fuel, gasoline, and diesel.Operational Flexibility: While substantial changes to the facilities or location require a new permit, the President explicitly authorized Enbridge to adjust the average daily throughput capacity and the directional flow of products without further approval.Regulatory Oversight: The facilities remain subject to all federal, state, and local laws. Free and unrestricted access must be granted to agencies for inspections, specifically those conducted by the Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA).National Security Provisions: The United States reserves the right to take possession and control of the pipelines if required for national security, provided the government provides notice and "just and fair compensation" to Enbridge.Liability and Indemnification: Enbridge is required to maintain the facilities in good repair and must hold the United States harmless from any liability, including costs related to environmental contamination or hazardous substance leaks.Termination: If the permit is revoked or surrendered, Enbridge is responsible for the removal of the "Border facilities" at its own expense.The issuance of this permit aligns with the administration's broader "Energy Dominance" agenda by streamlining the regulatory framework for existing critical energy infrastructure.

Episode metadata supplied by the publisher feed · Published Apr 17, 2026

Embed this episode

Ready to play

PRESIDENTIAL PERMIT: AUTHORIZING ENBRIDGE ENERGY, LIMITED PARTNERSHIP TO OPERATE AND MAINTAIN THREE EXISTING PIPELINE FACILITIES AT PEMBINA COUNTY, NORTH DAKOTA, AT THE INTERNATIONAL BOUNDARY

0:00 8:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The White House In Audio?

This episode is 8 minutes long.

When was this The White House In Audio episode published?

This episode was published on April 17, 2026.

Can I download this The White House In Audio episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!