PRM Chapter 10: BC Energy Regulator Surveys
from Storman Norman Presents Hosted by Storman Norman
High-liability surveys in BC's resource sector. We detail the specialized requirements for surveying well sites and pipelines under the BC Energy Regulator. Learn the specific plan drafting requirements, traverse accuracy standards, and how statutory rights of way interact with Crown land. Key Study Points: BCER plan requirements, pipeline right-of-way widths, and post-construction monumentation. Sources to Include: PRM Chapter 10, Survey and Plan Rules v 1.16 2026-01-15
Embed this episode
No transcript yet.