Skip to content
PRM Chapter 7 Field Work episode artwork

EPISODE · Mar 17, 2026 · 34 MIN

PRM Chapter 7 Field Work

from Storman Norman Presents · host Storman Norman

Taking the law into the field. We extract the mandatory field procedures required by the ABCLS and the Survey and Plan Rules. This episode covers the legal admissibility of field notes, the physical requirements for Type 1-5 monumentation, and the procedural standards for bearing trees and witness posts. Key Study Points: Sworn field notes vs. data collectors, legal monument types, and integration ties. Sources to Include: 06 - PRM Chapter 7 - V3.5, Survey and Plan Rules v 1.16 2026-01-15, IB - Witness Posts - Survey and Plan Rule - v1.3

Episode metadata supplied by the publisher feed · Published Mar 17, 2026

Embed this episode

Ready to play

PRM Chapter 7 Field Work

0:00 34:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Storman Norman Presents?

This episode is 34 minutes long.

When was this Storman Norman Presents episode published?

This episode was published on March 17, 2026.

Can I download this Storman Norman Presents episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!