PROGRAMA 74 episode artwork

EPISODE · Mar 10, 2014 · 1H 32M

PROGRAMA 74

from Podcast Habla Galápagos

Rendición de Cuentas del Gobierno Nacional, a través de la Empresa Eléctrica Elecgalápagos,, más de 14 proyectos ejecutados en Regeneración Eléctrica con una inversión en la provincia de 40 millones de dólares, 1000 medidores de ultima tecnología cambiados en la Región Insular, entre otros.

Episode metadata supplied by the publisher feed · Published Mar 10, 2014

Embed this episode

NOW PLAYING

PROGRAMA 74

0:00 1:32:53

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Podcast Habla Galápagos?

This episode is 1 hour and 32 minutes long.

When was this Podcast Habla Galápagos episode published?

This episode was published on March 10, 2014.

Can I download this Podcast Habla Galápagos episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!