PROGRAMA EL ORDEÑO DE LA TIERRA (08-05-15): HIDROELECTRICAS; DESARROLLO, DESPOJO O DESTRUCCION episode artwork

EPISODE · Jun 16, 2015 · 24 MIN

PROGRAMA EL ORDEÑO DE LA TIERRA (08-05-15): HIDROELECTRICAS; DESARROLLO, DESPOJO O DESTRUCCION

from Podcast radiocamoapa

PROGRAMA EL ORDEÑO DE LA TIERRA (08-05-15): HIDROELECTRICAS; DESARROLLO, DESPOJO O DESTRUCCION. EL GOBIERNO DE NICARAGUA Y DELEGADOS DE PAISES BAJOS ANUNCIARON LOS ESTUDIOS DEL PROYECTO HIDROELECTRICO AGUAS EL CARMEN. LOS ESTUDIOS DE FACTIBILIDAD SEGUN EL ESTADO DURARAN OCHO MESES.

Episode metadata supplied by the publisher feed · Published Jun 16, 2015

Embed this episode

NOW PLAYING

PROGRAMA EL ORDEÑO DE LA TIERRA (08-05-15): HIDROELECTRICAS; DESARROLLO, DESPOJO O DESTRUCCION

0:00 24:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Podcast radiocamoapa?

This episode is 24 minutes long.

When was this Podcast radiocamoapa episode published?

This episode was published on June 16, 2015.

Can I download this Podcast radiocamoapa episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!