EPISODE · Jul 16, 2021 · 5 MIN
Provincetown Inclined Elevator Inspection Continues
from Elevator World · host Elevator World
Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com PROVINCETOWN INCLINED ELEVATOR INSPECTION CONTINUES The newly constructed inclined elevator at the Pilgrim Monument and Provincetown Museum in Provincetown, Massachusetts, is still going through inspections after being declared fully functional in April, the Cape Cod Times reports. “We’ve learned elevator controllers and elevator safety is quite rigorous,” said K. David Weidner, executive director of the monument and museum. “'Safety first,’ is our motto.” The elevator, known as the Bradford Access Project, is designed to use a 162-ft length of double rails to bring the 3000-lb glass cab, with up to 18 people at a time, up from Bradford Street to the top of High Pole Hill, which is approximately 85-ft high, in 2 min. This elevator is the first of its size and magnitude in the Commonwealth, the source reports. The project is going through a series of pre-inspections by the Massachusetts Board of Elevator Regulations. The board regulates the construction, installation and operation of all elevators in the state. Weidner told the Engineering News Record that the addition of the conveyance is expected to boost revenue by as much as 50%. The museum has averaged up to 100,000 visitors annually. Work began in 2020 and it was intended to be operational in May 2021. Image credit: by Michaela Chesin for the Provincetown Banner To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn
Embed this episode
NOW PLAYING
Provincetown Inclined Elevator Inspection Continues
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.