£4,500 a Tender: Why Specialists Are Walking Away and How MCs Can Win Them Back (EP 207) episode artwork

EPISODE · Mar 3, 2025 · 44 MIN

£4,500 a Tender: Why Specialists Are Walking Away and How MCs Can Win Them Back (EP 207)

from Own The Build · host C-Link

Today’s Paul meets Michael Green, Managing Director at RED Systems Ltd, a leading specialist contractor with four divisions: structural glazing, SFS design, digital innovation, and glazing engineering.The Cost of Tendering: Michael explains why each new tender costs his business £4,500 on average and how this impacts decisions between pursuing new projects and focusing on repeat clients.Transparency in Tendering: Hear Michael’s call for clearer timelines, mid-tender reviews, and better collaboration to improve efficiency and trust in the tender process.Lessons from the East Anglia Project: Learn how Michael navigated the complexities of a high-profile project and the valuable insights gained on managing client expectations and tender resources.Building Specialist Expertise: Discover why treating subcontractors as trusted partners rather than commodities leads to better project outcomes and stronger industry relationships.🎙️ Don’t miss this insightful episode, packed with practical advice for specialist contractors and subcontractors navigating today’s construction challenges.📩 Have a question for Paul? Email [email protected] to have it answered in an upcoming episode!🎁 Exclusive Giveaway: Download your free eBooks:Mastering Your Career in Quantity SurveyingThe AI Revolution in Quantity SurveyingDownload them here - Free eBook Downloads.Send us Fan MailWant to connect with Paul?Paul is on Linkedin here and would love to talk. You can also connect with Paul at [email protected] or through, C-Link. C-Link is software built by Quantity Surveyors for Quantity Surveyors. We save 600 hours of Quantity Surveying time per project in automation. We can make your QS’ so much more efficient.Watch the Video to learn more; you can book a demo by clicking here. 

Today’s Paul meets Michael Green, Managing Director at RED Systems Ltd, a leading specialist contractor with four divisions: structural glazing, SFS design, digital innovation, and glazing engineering. The Cost of Tendering: Michael explains why each new tender costs his business £4,500 on average and how this impacts decisions between pursuing new projects and focusing on repeat clients.Transparency in Tendering: Hear Michael’s call for clearer timelines, mid-tender reviews, and better colla...

NOW PLAYING

£4,500 a Tender: Why Specialists Are Walking Away and How MCs Can Win Them Back (EP 207)

0:00 44:58

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Own The Build?

This episode is 44 minutes long.

When was this Own The Build episode published?

This episode was published on March 3, 2025.

What is this episode about?

Today’s Paul meets Michael Green, Managing Director at RED Systems Ltd, a leading specialist contractor with four divisions: structural glazing, SFS design, digital innovation, and glazing engineering.The Cost of Tendering: Michael explains why each...

Can I download this Own The Build episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!