Pythons in Kumasi Substation: Wildlife Intrusion or Deeper Faults Behind Dumsor? episode artwork

EPISODE · Apr 29, 2026 · 1H 51M

Pythons in Kumasi Substation: Wildlife Intrusion or Deeper Faults Behind Dumsor?

from Kuro yi mu nsem

Assessing the “dumsor” situation in Kumasi, where two pythons were found in an ECG substation in Ahodwo and linked to the outage, is this just a wildlife intrusion or a sign of deeper maintenance issues in the power system?

Episode metadata supplied by the publisher feed · Published Apr 29, 2026

Embed this episode

NOW PLAYING

Pythons in Kumasi Substation: Wildlife Intrusion or Deeper Faults Behind Dumsor?

0:00 1:51:46

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Kuro yi mu nsem?

This episode is 1 hour and 51 minutes long.

When was this Kuro yi mu nsem episode published?

This episode was published on April 29, 2026.

Can I download this Kuro yi mu nsem episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!