Radha Curpen: Can Canada Still Build Big Projects? episode artwork

EPISODE · Feb 21, 2026 · 51 MIN

Radha Curpen: Can Canada Still Build Big Projects?

from Power Struggle · host Stewart Muir Media

Canada says this is the decade of energy security and trade diversification.But can we actually build the infrastructure to make that happen?In this episode of Power Struggle, Stewart Muir sits down with Radha Curpen, National Leader of McMillan LLP’s ESG and Sustainability Practice, to unpack what it really takes to deliver major projects in Canada today.From pipelines and transmission lines to ports, data centres and critical minerals, Curpen explains why modern infrastructure must pass three tests: legal legitimacy, social durability, and capital credibility.The conversation explores:• The Canada–Alberta Memorandum of Understanding and what it actually means • Why a west coast pipeline is possible — but far from inevitable • Alberta’s urgency vs. B.C.’s caution • Indigenous consultation, equity ownership, and economic reconciliation • Why some investors now describe B.C. as “uninvestable” • How duplication and regulatory complexity stall projects • Why governance — not politics — determines durabilityCurpen argues that project success depends on early planning, corridor thinking, relationship-building, and legal clarity. Equity is no longer just about revenue sharing — it’s about operational oversight, environmental accountability, and long-term value for Indigenous communities.At stake is more than one pipeline.It’s whether Canada can operate as a first-world economy — attracting capital, reconciling rights, and building nation-scale infrastructure in an era of polarization.This is a national test case.Send us Fan MailThe energy conversation is polarizing. But the reality is multidimensional. Get the full story with host Stewart Muir.Reach out to us with thoughts, questions, or ideas at [email protected]🎧 For audio versions of our podcast visit powerstruggle.ca and listen on the go in your favourite podcast app!Video available on Power Struggle’s YouTube! https://www.youtube.com/@PowerStrugglePod

Episode metadata supplied by the publisher feed · Published Feb 21, 2026

Embed this episode

Canada says this is the decade of energy security and trade diversification. But can we actually build the infrastructure to make that happen? In this episode of Power Struggle, Stewart Muir sits down with Radha Curpen, National Leader of McMillan LLP’s ESG and Sustainability Practice, to unpack what it really takes to deliver major projects in Canada today. From pipelines and transmission lines to ports, data centres and critical minerals, Curpen explains why modern infrastructure must pass ...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Radha Curpen: Can Canada Still Build Big Projects?

0:00 51:24

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Struggle?

This episode is 51 minutes long.

When was this Power Struggle episode published?

This episode was published on February 21, 2026.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Power Struggle episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!