EPISODE · May 27, 2025 · 1H 24M
Raglan Talking to Raglan - 27-05-2025
As Council decides on its Long Term Plan, a few quotes from its responses, such as the sewage plant “will provide treatment for up to 10500 PE (people equivalent) or flows of up to 6000m3/d.” and “Council has undertaken a transportation assessment of Raglan township which identified the current 1-lane bridge will need to be upgraded to a 2-lane bridge post 2035.” Also a couple of Morning Show interviews on ways of dealing with waste.
Embed this episode
Ready to play
Raglan Talking to Raglan - 27-05-2025
0:00
1:24:50
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Raglan Talking to Raglan?
This episode is 1 hour and 24 minutes long.
When was this Raglan Talking to Raglan episode published?
This episode was published on May 27, 2025.
Can I download this Raglan Talking to Raglan episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!