EPISODE · Oct 7, 2021 · 16 MIN
Rail Group On Air: 2021 RT&S Top Projects, Part 4
from Rail Group On Air · host RT&S, Railway Age, IRJ
Railway Track & Structures Editor-in-Chief Bill Wilson talks with Eric Fields about the first lift of a new truss section at the Merchants Bridge site in St. Louis.
Embed this episode
NOW PLAYING
Rail Group On Air: 2021 RT&S Top Projects, Part 4
0:00
16:52
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Rail Group On Air?
This episode is 16 minutes long.
When was this Rail Group On Air episode published?
This episode was published on October 7, 2021.
Can I download this Rail Group On Air episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!