Rail Group On Air: 2021 RT&S Top Projects, Part 4 episode artwork

EPISODE · Oct 7, 2021 · 16 MIN

Rail Group On Air: 2021 RT&S Top Projects, Part 4

from Rail Group On Air · host RT&S, Railway Age, IRJ

Railway Track & Structures Editor-in-Chief Bill Wilson talks with Eric Fields about the first lift of a new truss section at the Merchants Bridge site in St. Louis.

Railway Track & Structures Editor-in-Chief Bill Wilson talks with Eric Fields about the first lift of a new truss section at the Merchants Bridge site in St. Louis.

NOW PLAYING

Rail Group On Air: 2021 RT&S Top Projects, Part 4

0:00 16:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 16 minutes long.

When was this Rail Group On Air episode published?

This episode was published on October 7, 2021.

What is this episode about?

Railway Track & Structures Editor-in-Chief Bill Wilson talks with Eric Fields about the first lift of a new truss section at the Merchants Bridge site in St. Louis.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!