Rail Group On Air—An Alaskan Reality: Constructing the White Pass Loop episode artwork

EPISODE · Apr 22, 2020 · 19 MIN

Rail Group On Air—An Alaskan Reality: Constructing the White Pass Loop

from Rail Group On Air · host RT&S, Railway Age, IRJ

RT&S Editor-in-Chief Bill Wilson talks with Mark Taylor, Superintendent of Operations at White Pass and Yukon Route Railroad about the White Pass Loop project. The White Pass Loop Project was a 2020 RT&S Top Project.

RT&S Editor-in-Chief Bill Wilson talks with Mark Taylor, Superintendent of Operations at White Pass and Yukon Route Railroad about the White Pass Loop project. The White Pass Loop Project was a 2020 RT&S Top Project.

NOW PLAYING

Rail Group On Air—An Alaskan Reality: Constructing the White Pass Loop

0:00 19:35

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 19 minutes long.

When was this Rail Group On Air episode published?

This episode was published on April 22, 2020.

What is this episode about?

RT&S Editor-in-Chief Bill Wilson talks with Mark Taylor, Superintendent of Operations at White Pass and Yukon Route Railroad about the White Pass Loop project. The White Pass Loop Project was a 2020 RT&S Top Project.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!