Rail Group On Air: Battling the wildfires of summer episode artwork

EPISODE · Dec 16, 2021 · 21 MIN

Rail Group On Air: Battling the wildfires of summer

from Rail Group On Air · host RT&S, Railway Age, IRJ

RT&S Editor-in-Chief Bill Wilson talks with the Arizona Eastern Railway about the destruction and rebuilding of the Gila River railroad bridge in Arizona.

RT&S Editor-in-Chief Bill Wilson talks with the Arizona Eastern Railway about the destruction and rebuilding of the Gila River railroad bridge in Arizona.

NOW PLAYING

Rail Group On Air: Battling the wildfires of summer

0:00 21:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 21 minutes long.

When was this Rail Group On Air episode published?

This episode was published on December 16, 2021.

What is this episode about?

RT&S Editor-in-Chief Bill Wilson talks with the Arizona Eastern Railway about the destruction and rebuilding of the Gila River railroad bridge in Arizona.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!