EPISODE · Jun 25, 2020 · 27 MIN
Rail Group on Air: Progress on the Orlando high-speed rail project
from Rail Group On Air · host RT&S, Railway Age, IRJ
RT&S Editor-in-Chief Bill Wilson talks with Brightline Executive Vice President of Rail Infrastructure Mike Cegelis on how work is moving along on the Orlando Extension project.
Embed this episode
NOW PLAYING
Rail Group on Air: Progress on the Orlando high-speed rail project
0:00
27:40
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Rail Group On Air?
This episode is 27 minutes long.
When was this Rail Group On Air episode published?
This episode was published on June 25, 2020.
Can I download this Rail Group On Air episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!