Rail Group on Air: Progress on the Orlando high-speed rail project episode artwork

EPISODE · Jun 25, 2020 · 27 MIN

Rail Group on Air: Progress on the Orlando high-speed rail project

from Rail Group On Air · host RT&S, Railway Age, IRJ

RT&S Editor-in-Chief Bill Wilson talks with Brightline Executive Vice President of Rail Infrastructure Mike Cegelis on how work is moving along on the Orlando Extension project.

RT&S Editor-in-Chief Bill Wilson talks with Brightline Executive Vice President of Rail Infrastructure Mike Cegelis on how work is moving along on the Orlando Extension project.

NOW PLAYING

Rail Group on Air: Progress on the Orlando high-speed rail project

0:00 27:40

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 27 minutes long.

When was this Rail Group On Air episode published?

This episode was published on June 25, 2020.

What is this episode about?

RT&S Editor-in-Chief Bill Wilson talks with Brightline Executive Vice President of Rail Infrastructure Mike Cegelis on how work is moving along on the Orlando Extension project.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!