Rail Group On Air: The Construction of Edmonton's Tawatina Rail Bridge episode artwork

EPISODE · May 6, 2020 · 21 MIN

Rail Group On Air: The Construction of Edmonton's Tawatina Rail Bridge

from Rail Group On Air · host RT&S, Railway Age, IRJ

Railway Track & Structures magazine Editor-in-Chief talks to Jerry Pfuntner of Finley Engineering Group about the design and construction of the Tawatina Bridge.

Railway Track & Structures magazine Editor-in-Chief talks to Jerry Pfuntner of Finley Engineering Group about the design and construction of the Tawatina Bridge.

NOW PLAYING

Rail Group On Air: The Construction of Edmonton's Tawatina Rail Bridge

0:00 21:00

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 21 minutes long.

When was this Rail Group On Air episode published?

This episode was published on May 6, 2020.

What is this episode about?

Railway Track & Structures magazine Editor-in-Chief talks to Jerry Pfuntner of Finley Engineering Group about the design and construction of the Tawatina Bridge.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!