EPISODE · May 6, 2020 · 21 MIN
Rail Group On Air: The Construction of Edmonton's Tawatina Rail Bridge
from Rail Group On Air · host RT&S, Railway Age, IRJ
Railway Track & Structures magazine Editor-in-Chief talks to Jerry Pfuntner of Finley Engineering Group about the design and construction of the Tawatina Bridge.
Embed this episode
NOW PLAYING
Rail Group On Air: The Construction of Edmonton's Tawatina Rail Bridge
0:00
21:00
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Rail Group On Air?
This episode is 21 minutes long.
When was this Rail Group On Air episode published?
This episode was published on May 6, 2020.
Can I download this Rail Group On Air episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!